Saturday 9th April – 9 am – delivery van arrives with the kitchen.
Carried inside and sorted.
Lots of ‘flat-packs’ to be assembled. Alarmed that the sink is SO heavy!
Monday 9th April – 9 am LeRoy Merlin truck arrives with the wood flooring and the cladding
Cladding comes off first
Hope there’ll be enough – doesn’t look like much!
And here is the wood for the Kitchen and Livingroom floors